1.This website models specifications for the regular production of our factory products, all kinds of technical data for type selection reference only, the product eventually based on national standard, non-standard products will be negotiated additionally trial agreement or contract;
2.To specify when ordering the product name, model, specification, color, line core voltage grade, packaging, delivery quantity, standard serial number and date of delivery, and special emphasis on the requirements;
3.Product delivery period normally according to the working day is divided into three days, a week, ten days, and a half months, 20, 45 days, two months, January, march, the longest do not exceed half a year, special circumstances for urgent production, but in principle according to the urgent production product 1% ~ 5% of contract value as the urgent fee;
4.Each package delivery number length or allow a plus or minus 0.5% (some products is plus or minus 5%) error, but the total error is no more than plus or minus 5% of the total delivery;
5.Delivery of each batch have not exceeding 10% of the total batch delivery is allowed in the short period of no less than 10% of the packing length (length) of delivery, but each delivery package can not more than two paragraphs;
6.When you place an order in general, the quoted prices do not include the freight and taxes and fees, payment term is no more than three months, the payment number is no more than three times, down payment deposit, at least not less than 30% of payment on delivery to at least 90% of the total amount of delivery, quality retention money is no more than 10%, quality assurance period the longest do not exceed one year.
7.Below 200 m, 100 m order to respectively on the basis of normal price add 50% to 80%, or 200 yuan to 500 yuan for the short meters, and freight collect by the user;
8.When you place an order must be clearly set forth the mode of transportation, place of delivery, unloading, receiving unit, contact name and phone and receiving date;
9.After signing the contract, if the product specification, quantity, packing and so on change, want to advance in a written form, and form a supplementary agreement agreed by both sides talks things over, but if the proposed changes when the products are continual production or unable to change, with the original contract execution;
10.Before contract signature, to check the detail and the content, if there is any discrepancy with the wrong shall be made in a timely manner and determined between each other, the contract shall come into force upon signature is and will be implemented strictly in accordance with the "contract law".
2.To specify when ordering the product name, model, specification, color, line core voltage grade, packaging, delivery quantity, standard serial number and date of delivery, and special emphasis on the requirements;
3.Product delivery period normally according to the working day is divided into three days, a week, ten days, and a half months, 20, 45 days, two months, January, march, the longest do not exceed half a year, special circumstances for urgent production, but in principle according to the urgent production product 1% ~ 5% of contract value as the urgent fee;
4.Each package delivery number length or allow a plus or minus 0.5% (some products is plus or minus 5%) error, but the total error is no more than plus or minus 5% of the total delivery;
5.Delivery of each batch have not exceeding 10% of the total batch delivery is allowed in the short period of no less than 10% of the packing length (length) of delivery, but each delivery package can not more than two paragraphs;
6.When you place an order in general, the quoted prices do not include the freight and taxes and fees, payment term is no more than three months, the payment number is no more than three times, down payment deposit, at least not less than 30% of payment on delivery to at least 90% of the total amount of delivery, quality retention money is no more than 10%, quality assurance period the longest do not exceed one year.
7.Below 200 m, 100 m order to respectively on the basis of normal price add 50% to 80%, or 200 yuan to 500 yuan for the short meters, and freight collect by the user;
8.When you place an order must be clearly set forth the mode of transportation, place of delivery, unloading, receiving unit, contact name and phone and receiving date;
9.After signing the contract, if the product specification, quantity, packing and so on change, want to advance in a written form, and form a supplementary agreement agreed by both sides talks things over, but if the proposed changes when the products are continual production or unable to change, with the original contract execution;
10.Before contract signature, to check the detail and the content, if there is any discrepancy with the wrong shall be made in a timely manner and determined between each other, the contract shall come into force upon signature is and will be implemented strictly in accordance with the "contract law".
Production equipment and testing equipment